Swaccha Margao

Gasification Plant 24 x 7

MMC | GEDA

Sonsodo Gasification Facility, Margao

Public Transparency Dashboard

10 TPD

5 Years (60 Months) Contract

Public Transparency Dashboard
Partner login
Whole-of-project accountability · 60 months

Achieved Vs Planned — 60-Month Term

This facility processes municipal solid waste delivered directly from the Transfer & Sorting Stations (TSS). The table below compares what the plant has actually achieved so far (from the daily weighbridge ledger, Apr 2026 onward) against the full 60-month plan. Everything is quantified against international standards (UNFCCC CDM, EBC/Puro.earth, CPCB EPR); pick any month further down to drill into its day-by-day ledger.

MetricAchieved (to date)% of plan to datePlanned (60 months)% of full plan
How "Planned" is built: the actual months recorded so far plus every remaining month projected at the June-2026 demonstrated rate (~9.69 t/day, one biochar cycle per week, ash 3.6–4.8%). Early in the term the "% of plan" bars are naturally small — the term itself is only elapsed; the bar to compare against is the term-progress bar above.

Processed Tonnage Across All 60 Months (click a bar to open that month)

Monthly processed (tonnes)
Choose a month

60-Month Operating Index

Each tile summarises one operating month. Click it to load that month's daily ledger, credits, test reports and value split below.

How the facility works · illustration

Process Flow

From tipper to energy, ash and biochar — the block flow of the Sonsodo facility. Solid arrows are material / product flows; the dashed teal marks streams recycled back into the gasifier.

1 · WASTE INTAKE & GASIFICATION Tipper delivers mixed waste Unloaded on receiving ramp Conveyor feeds the gasifier GASIFIER gasification → energy + heat Energy / heat generated on site ↺ Recycled back into the gasifier • Syngas — fed back for heating • Pyrolysis oil — reused to ignite the waste • Unburnt combustibles left at shift-end The pyrolysis tank is heated by the same gasifier; nothing combustible is wasted. 2 · BOTTOM RESIDUE Bottom residue screened & separated Ash 3–5% of feed Inert non- combustibles Metal Glass 3 · COCONUT PYROLYSIS (heated by the same gasifier) Coconuts loaded in pyrolysis tank PYROLYSIS TANK closed; heated by the gasifier Free water Oil + water distilled mix Syngas Biochar leftover product Gravity separation (+ alum) Oil Water Material / product flow Recycled back into the gasifier
Independently tested · public quality record

Product Quality — Test Reports

The facility's two saleable by-products — inert ash and biochar — are tested against national and international standards. Representative reports are shown below; each batch's accredited certificate replaces these figures as it is issued.

Representative Ash Test Report NABL-accredited lab

ParameterMethodResultPermissible limitStatus
Loss on ignition (unburnt carbon)IS 17272.4%≤ 5% (IS 3812)Pass
SiO₂ + Al₂O₃ + Fe₂O₃IS 172778.6%≥ 70% (IS 3812 Pt-1)Pass
Lead (Pb) — TCLP leachateUS EPA 13110.9 mg/L≤ 5.0 mg/LPass
Cadmium (Cd) — TCLPUS EPA 13110.06 mg/L≤ 1.0 mg/LPass
Chromium (Cr) — TCLPUS EPA 13111.1 mg/L≤ 5.0 mg/LPass
Arsenic (As) — TCLPUS EPA 13110.3 mg/L≤ 5.0 mg/LPass
Mercury (Hg) — TCLPUS EPA 13110.008 mg/L≤ 0.2 mg/LPass
Class (SWM Rules 2016)CharacterisationNon-hazardous inertConstruction reusePass
Leachate results well within US EPA TCLP thresholds and CPCB inert-waste criteria — the ash is a saleable, non-hazardous construction input, not a landfill burden.

Representative Biochar Test Report EBC / IBI parameters

ParameterMethodResultEBC / IBI benchmarkStatus
Total organic carbon (Corg)DIN 5173272%≥ 50% (EBC)Pass
H/Corg molar ratio (stability)EBC0.36≤ 0.7 (EBC)Pass
O/Corg molar ratioEBC0.18≤ 0.4Pass
Specific surface area (BET)BET N₂245 m²/g≥ 150 m²/gPass
pHISO 103909.28–10Pass
Lead (Pb)ICP-OES28 mg/kg≤ 120 mg/kg (EBC)Pass
Cadmium (Cd)ICP-OES0.4 mg/kg≤ 1.5 mg/kg (EBC)Pass
PAH (16 EPA, sum)GC-MS3.1 mg/kg≤ 6 mg/kg (EBC premium)Pass
Carbon permanence (100-yr)Puro.earth/EBC> 80%≥ 80% durablePass
H/Corg of 0.36 confirms a highly stable char (well under the 0.7 EBC ceiling) — the basis for qualifying the carbon as a permanent removal under Puro.earth.

Pictures

Videos

Goa 10 TPD Gasification Unit
Gasifier Combustion Chamber
Biochar From Pyrolysis
Partner access

Partner sign in

The sections above are open to everyone. Detailed operating data — the daily ledger, values, live-emissions portal and documents — is for authorised partners (GEDA, MMC, GSPCB and the operator). Accounts are issued by the facility administrator; if you are a partner, sign in below to view everything.